Assignment Name : Detailed Project Report for Development of Multimodal Logistics Park at Jogighopa and Detailed Project Report for External Trunk Connectivity Infrastructure to the Multimodal Logistics Park Site in Jogighopa.
Location : India
Client: National Highway Authority of India
MoRTH has undertaken a Logistics Efficiency Enhancement Programme (LEEP) initiative to improve the efficiency of logistics in India which was the genesis of approval of Bharatmala Pariyojana. Among the solution themes identified under the LEEP initiative, development of Multi-Modal Logistics Parks (MMLPs) is one of the key solution themes. To implement this theme, MoRTH is mandated to undertake development of 35 MMLPs which will enable reduction of transportation costs as well as reduce CO2 emissions.
One of these state-of-the-art Multi-Modal Logistics Parks is proposed to be developed at Jogighopa in order to improve Logistics efficiency and to facilitate Domestic and EXIM trade in the North Eastern states.
Site Survey and Assessment including Topographical Survey, Geotechnical Survey and Traffic survey and Environment & Social Survey
Trunk Infrastructure Gap Assessment
Concept Master Plans & Detailed Master Plan with Basic Architecture design (2D & 3D) & plans; and Engineering Designs & Plans
Statutory documents for clearances related to Land Acquisition such as 3a, 3A, 3D and 3G notifications; Forest Clearance; and EIA & SIA Clearances
Assessment of Utilities shifting and estimates
Preparation of Feasibility Study Reports
Detail Project Report for External Rail and Road Trunk Connectivity Infrastructure
Bid document including Draft Concession Agreement and Technical Schedule