PMC of doubling with electrification between Villupuram – Dindigul, Southern Railway in Tamil Nadu

Assignment Name : Project Management Consultancy for: Execution of Doubling of Track between Villupuram and Dindigul: “Construction of Roadbed, Minor Bridges, Supply of Ballast, Installation of Track, Electrical and outdoor Signalling and Telecommunication works for Doubling of Track for the section Villupuram – Vriddhachalam – Ariyalur in Tiruchchirappalli Division of Southern Railway, Tamil Nadu, India

Location : India

Client: Rail Vikas Nigam Limited (RVNL)

Narrative description of Project

Voyants Solutions Pvt. Ltd. is acting as an engineer on behalf of RVNL to execute the doubling work between Villupuram and Dindigul on Tiruchchirappalli Division of Southern Railway in the state of Tamil Nadu (107.88 Km). The project comprises of doubling of existing line with electrification, preparation of formation, ballasting, laying of BG track, bridge works (227 minor bridges), construction of required buildings, platforms, foot over bridges, general electrical works, wiring of the new line and station yards, traction substation, replacement of existing Relay Interlocking with Electronic Interlocking (EI) and equipping new line with Automatic Permissive Block.

Copyright © 2017 Voyants Solutions Pvt Ltd.

All rights reserved.