1 |
Preparation of Feasibility Study & Master Planning for the Development of a 1000 Ha SEZ in Isle Boulay, Abidjan, Cote D’Ivoire |
Ministry of Infrastructure, Govt.of Cote D’Ivoire |
2 |
Bid Process Management for the Development of a 1 km long sea link Bridge to Connect Isle Boulay in Abidjan, Cote D’Ivoire |
Ministry of Infrastructure, Govt.of Cote D’Ivoire |
3 |
Pre-Feasibility Study of the Northern Growth Pole in Côte d’Ivoire |
Ministry of Infrastructure, Govt.of Cote D’Ivoire |
4 |
Detailed Survey and Investigations and Detailed Project Report for Singrobo (42 MW) Hydro Electric Power Project in Cote d’Ivoire |
Ivoire Hydro Energy S.A. |
5 |
Pre-Feasibility Report for 36MW Tissale Hydro Electric Power Project |
Ivoire Hydro Energy S.A. |
6 |
Power Potential Assessment study for 54MW Dibotein Hydro Electric Power Project in Cote d’Ivoire |
Ivoire Hydro Energy |