Consultancy Services for Preparation of EIA/EMP Report and Obtaining Environmental Clearance for Development of an Outer Harbour Nearer to South of Existing South Breakwater at Paradip Port

Assignment Name : Consultancy Services for Preparation of EIA/EMP Report and Obtaining Environmental Clearance for Development of an Outer Harbour Nearer to South of Existing South Breakwater at Paradip Port

Location : Paradip, Orissa.

Client: HOWE Engineering Projects (India) Pvt Ltd

Narrative description of Project

The project involves

  • Preparation of EIA/EMP Report and obtaining Environmental Clearance for Development of an Outer Harbour Nearer to South of Existing South Breakwater at Paradip Port.

The project scope includes

  • Conducting Environmental Baseline Study and preparing EIA Report for obtaining Environmental Clearance.
  • Conducting CRZ study for obtaining CRZ Clearance.
  • Assisting the client in obtaining the statutory clearances & Public Hearing etc.

Copyright © 2020 Voyants Solutions Pvt Ltd.

All rights reserved.